The construction planning of the 1/2,000 scale for the development of industry and service at the area section between Noi Bai and Lao Cai expressways and provincial road 305C in Lap Thach district, Song Lo district, Vinh Phuc province

10/01/2018

1. Location and scope of planning

1.1. Scope of planning

In Van Quan, Dinh Chu, Trieu De communes in Lap Thach district and Cao Phong commune in Song Lo district. The scope is as follows:

- The East borders the resident and agricultural land of Dinh Chu commune, Trieu De commune;

- The South, the West are near the inter-commune dyke road from Trieu De to Cao Phong;

- The North is bordered by residential and agricultural land of Van Quan commune and the project of road to Tam Son town.

1.2. Planning scale:

- The total planning area: 459.98 hectares (increase 37.68 hectares compared to planning tasks due to the expansion of the planning area to articulate the planning and current status of neighboring areas);

- Population size is forecasted in 2030: About 4,300 people.

 

2. Characteristics:

It is an area for the development of  ​​industry, trade, services and housing in the area of ​​Noi Bai - Lao Cai expressway and 305C street; It is the economic center and the driving force for development in the south of Lap Thach district; It is a synchronous area with existing planning projects which constitute a development area with synchronous and modern infrastructure in line with the development orientation of the general planning and practical conditions of the region. .

 

3. Contents of the planning

 

3.1. Organization of landscape planning space architecture:

- Subdivision is divided into 03 areas planned for control and development: Area 1 north of Noi Bai - Lao Cai highway in Van Quan commune; Area of ​​about 154.82 ha. The second area of the South of Noi Bai - Lao Cai expressway and North of Ha Noi - Lao Cai expressway in Van Quan, Dinh Chu, Cao Phong communes; ​​about 180.02 hectares. The third area in the South of Hanoi-Lao Cai expressway; the total area is about 125.14ha. Build a system of green trees separated along the Hanoi-Lao Cai expressway and railways; construction of drainage ditches in the east of the planned area ... to improve the drainage environment for the planning area and the surrounding area.

- Main architectural areas include: architectural - natural landscape areas with green parks, green corridors. Architectural - artificial landscapes include areas of civil architecture, architectural areas outside the civil.

- The overall layout of landscape architecture: The overall layout of the landscape architecture is set on the basis of the 306C space axis, the center of landscape lane, the gateway intersections, Public administration, public service, trade ...

 

3.2. The total land use planning

No.

Kind of land

Area (ha)

Rate (%)

Ghi chú

I

 

Residential land

176.48

38.37

 

1

Land for public service

5.27

1.15

 

2

Land of trees

5.81

1.26

 

3

Landscape

132.33

28.77

 

a

New housing (social housing, worker housing, low-rise housing)

39.23

 

 

b

Land in the state of reform

93.10

 

 

4

Land traffic internal

33.07

7.19

 

II

 

Land outside the civil

181.17

43.58

 

1

Land of specialized centers

34.68

7.54

 

a

Land training, research

14.83

 

 

b

Land service trade

17.33

 

 

c

Land office, office

2.52

 

 

2

Industrial land

85.20

18.52

 

3

Religious land, relics

0.66

0.14

 

4

Cemetery land

4.32

0.94

 

5

Land for foreign traffic

33.86

7.36

 

6

Land for technical and environmental sanitation

2.62

4.76

 

7

Green land isolation

19.83

4.31

 

III

 

Other land

99.29

21.59

 

1

Agricultural land

82.46

17.93

\

/

2

Water surface, irrigation

16.84

3.66

 

 

 

Total

459.98

100

 

Indicators of functional area:

- Public service centers: The total land area is 5.27 hectares; including educational land (signed as TH), cultural land, community activities (CC). Public buildings with a construction density of 40%; average height from 1 to 3 floors.

- Residential areas: Total area of ​​132.33 ha, including: land lots for construction of new low-rise area of ​​36.07 ha (OM); plots of social housing and workers' housing area of ​​3.16ha (OCC); The land area of ​​the current status of total area of ​​3.16 ha (OC). Low-rise buildings with average construction density of 60%, average height of 3.5 floors. Land for construction of social areas, houses with construction density of 40%, average height of 05 floors (technical expenses of residential areas are specified in the detailed planning and project stages. Construction investment on the basis of actual needs).

- Flower gardens: total area of ​​5.81 ha; in lots of land marked as CX;

Indicators of non-residential functional areas:

- Industrial development zone: The total land area for industrial development is 85.20 ha; in land lots marked as CN; the average construction density is 60%; average height from 1 to 3 floors.

- Land for specialized centers: The total area is 34.68 hectares; Including school land lots, commercial land, office land, offices with TH, TM and CQ signatures. Construction of the building construction density of 40% average, the average height from 1 to 5 floors.

- The green area of the railway, highway: the total area of 19.83ha, the lot of land marked as CXCL;

- Land for traffic and other infrastructure works. Land use details and technical specifications are detailed in the planning drawing.

 

3.3. Technical planning of the site:

- Ground leveling: Ground leveling on the basis of ensuring drainage in and outside the planning area, on the principle of utilizing the natural terrain, the elevation of the ground leveling design from 12.00 to 31.25.

- Rainwater drainage in the planned area shall be divided into 08 water drainage basins. Water drainage, drainage system, rain water drainage sewer and drainage system in and outside the planning area. Water drainage system includes drainage ditches of D600 to DI200; To renovate the system of ditches, drainage sewers of the area going through the planned land with open ditch systems.

 

3.4. Traffic network planning:

- Road network:

+ The section 2-2 (Noi Bai - Lao Cai expressway): B = 33.0m = 0.75m + 15.0m + l, 5m + 15.0m + 0.75m);

+ Section 3-3, 3A-3A, 3B-3B (Provincial road 305C): B = 31.0m = 4.0m + 10.5m + 2.0m + 10.5m + 4.0m;

+ Section 4-4: B = 24.0m = 4.5m + 15.0m + 4.5m;

+ Section 5-5: B = 22.5m = 6.0m + 10.5m + 6.0m;

+ Section 6-6: B = 19.5m = 4.5m + 10.5m + 4.5m;

+ Section 7-7: B = 16.5m = 3.0m + 10.5m + 3.0m;

+ Section 8-8: B = 13.5m = 3.0m + 10.5m;

+ Section 9-9: B = 13.5m = 3.0m + 7.5m + 3.0m;

+ Section 10-10, 11-11, 12-12 and 13-13: B = 6.5 m to 15, Om

- Planning of the Hanoi-Lao Cai expressway

Planning the Vinh Phuc province to 2030 and vision to 2050;

- Public transport network, parking storm: Arrange bus routes on Provincial road 305C, 24m road. To build new parking lots in the function of ensuring adequate parking lots according to the prescribed norms;

- Red line boundaries, construction boundaries: The construction backward distance from the red line at the road sections of at least 3.0m for houses and 6.0m for public and commercial works. and industrial production.

 

3.5. Power supply planning:

- Demand for electricity: The estimated total charge is about 6,500KW.

- Power source: short-term power source using 10KV civil roads from Lap Thach 110KV intermediate transformer station; Long-term phase using additional source from Song Lo 110KV substation.

- Power supply system: Upgrading, upgrading and moving 10KV lines, existing through the area to supply electricity to the area.

- Build a system of transformer stations supplying electricity for production, daily-life electricity and lighting for the region. The transformer stations in the area use 10/22 / 0.4KV voltage level with the total number of 31 stations capacity from 30KVA to 2x2000KVA. Low voltage grid with voltage 220 / 380V using 3-phase four-wire three-phase floating ground, from the power supply to the general cabinet of each housing, each work.

 

3.7. Water supply planning:

- The total estimated demand for water is about 2,300 m3 / day.

- The estimated water supply from Duc Bac water supply plant in Vinh Phuc province;

- Water supply network: Design the water supply network for the area in the form of combination of water supply for production, living and fire. The distribution water distribution network is a DN110 to D200 diameter cast iron pipe that ensures sufficient flow and pressure for the planning area; update the provincial water supply system through the planned area. Fire hydrants are connected to a distribution network of diameter D> 100 mm and are located near a fork, intersection, or large roadway to ensure the regulation and convenience of fire prevention and control.

 

3.8. Waste water and sanitation planning:

- Wastewater: The wastewater volume is calculated to reach at least 80% of the supplied water volume. Drainage systems using HDPE sluices or HDPE pipes from D250 to D500 are separated from rainwater drainage systems for new planning areas. Daily-life wastewater is treated locally through septic tanks, leading to the planned treatment stations of the area for elaboration of treatment planning up to standards according to the current regulations before being discharged into rain water drainage systems. Industrial waste water is collected to the planned treatment station with a capacity of 1300m3 / day.

- Solid waste: Solid wastes are classified, collected and transferred to local and regional solid waste treatment facilities.

 

3.9. Planning communication system:

- Communication system including telephone, internet and cable TV are built in synchronous connection with technical infrastructure system. In the general planning direction, the area is provided with signals from the satellite switchboard of Lap Thach and Song Lo.

 

3.10. Measures to protect the environment:

- Soil environment: rational exploitation and use of land. Classification of solid waste at source to facilitate the collection, sorting, recycling, thorough treatment of arising solid waste.

- Environment, noise: Planting trees in the empty land around parking lot, warehouses. Invest in pollution treatment facilities right after the functional areas are put into operation.

- Protect the water environment: Build a system of waste water collection and treatment for standard treatment before discharging into the environment. Limit exploitation of underground water sources.

- Management solutions: Construction investment projects must make environmental impact assessment reports, which are appraised and supervised by the competent authorities when they are operational.

- Details at the planning drawing with the ratio 1/2000 was appraised by the Construction Department.

 

(According to Decision No. 101 / QĐ-UBND, dated on 2017/1/10)