The Project of parallel road of Hanoi - Lao Cai railway (Northern route), the section from National Highway (NH) 2C to Hop Thinh - Dao Tu road

22/11/2019

1. Investment objective: Gradually perfect the infrastructure system of Vinh Phuc urban frame according to the approved planning; reduce traffic volume on NH2 in the direction of Vinh Tuong, Tam Duong, Lap Thach and Song Lo districts. Vinh Yen and vice versa; exploit surrounding land fund for specific steps of Vinh Phuc urban planning.

2. Investment scale:

- The parallel line of Hanoi - Lao Cai railway, the Northern route in the project has a length of about L = 4,130m, starting at the intersection with NH2C and ending at the intersection with Hop Thinh - Dao Tu road and 02 branches to the railway overpassing on Hop Thinh - Dao Tu street.

- The size of the main cross-section: with Bbackground = 24.0m, Bsurface = 2x8.0m, Bpc = 2.0m, Bleft pavement = 1.50m (adjacent to the railway), B right pavement = 4.5m; branch route to synchronous investment bridge. Soft pavement structure with asphalt concrete.

- Catagories: Intersections, drainage systems, sidewalks (in appropriate locations), green trees, lighting, synchronous traffic safety.

3. Group of projects: Group B, field of transportation.

4. Total investment of the project: VND 336,000 million.

5. Investment capital sources:

- From the provincial-level budget expenditure savings source transferred from 2018 to 2019 is VND 150,000 million

- From the provincial-level budget balance transferred from 2018 to 2019 is VND 40,000 million;

- From the capital of public investment plan in the period of 2021 - 2025: VND 146,000 million.

6. Project location: Vinh Yen city and Tam Duong district, Vinh Phuc province.

7. Implementation time and progress: From 2019 - 2022.

 (According to the Resolution of the Vinh Phuc Provincial People's Council Session XVI,
13 th session, adopted on October 23, 2019).