The Project on renovating and expanding provincial road (PR) 305, section from Km0 + 00 -: - Km3 + 750 (Yen Lac district)

21/11/2019

1. Investment objectives: complete and synchronize the transport infrastructure system according to the planning; serve the travel of people; improve the operational efficiency of the route; ensure urban beauty and environmental sanitation; create favorable conditions and promote local economic, social and cultural development.

2. Investment scale:

The PR.305 section of the project is 3.75 km long, starting from Km0 + 000 (intersecting with the Red River dike) in Yen Phuong commune, ending at Km3 + 750 in Tam Hong commune, of which:

- Section from Km0 + 000 -: - Km0 + 466: Actual situation of Bbackground = 11m, Bsurface= 9.0m. Maintain the roadbed; widen the road surface to the surface Bsurface = 11.0m (including the bearing sections on both sides).

- Section from Km0 + 466 -: - Km1 + 972: Actual situation of Bbackground = 9m, Bsurface = 8.0m. Widening the ground, the road surface with Bbackground = 12m, Bsurface = 11.0m.

- Section from Km1 + 972 -: - Km2 + 360: The state of the ground = 11m, the surface = 9.0m. Widen the ground, the road surface with Bbackground = 13m, Bsurface = 11.0m.

- Section from Km2 + 360 -: - Km2 + 570: The state of the ground = 9.5m, the surface = 8.5m. Expand road base and road surface with Bbackground = 12m, Bsurface = 11.0m.

- Section from Km2 + 570 -: - Km3 + 300: The state of the ground = 11m, Bsurface = 9m. Widening the road surface with Bsurface = 11,0m (including the bearing sections on both sides).

- Section from Km3 + 300 -: - Km3 + 750: Actual state of Bsurface = 12.5m. Maintain the width of the road surface.

- Items of vertical drainage system, horizontal drainage system, traffic safety and relocation of infrastructure projects are invested synchronously.

3. Project group: Focus of Group C.

4. Total investment of the project: 73.8 billion dong.

5. Investment capital sources:

- From the provincial-level budget expenditure saving source in 2017 to 2019 is VND 30 billion

- From the source of medium-term public investment plan in the period of 2021-2025 is VND 34.9 billion

- From Yen Lac district budget: VND 8.9 billion

6. Project location: Tam Hong and Yen Phuong communes, Yen Lac district.

7. Implementation time and progress: 2019-2021.

 (According to the Resolution of the Vinh Phuc People's Council Session XVI,
13th session, adopted on October 23, 2019)
.